为了更佳的浏览体验,将您的浏览器保持最新。在这里您可以获得最新的版本。

案例研究

特色案例研究

Texas Co-op Migrates from Power Line Carrier System to Sensus Next-Generation AMI

 Comanche Electric Cooperative covers seven counties and services 5,000 miles of power line. This vast Texas landscape serves as a playground for outdoor enthusiasts, but it’s no walk in the park for the cooperative to provide dependable services to customers. “Generating and distributing power can be a tricky business in the rural and rugged Texas terrain,” said Chad Foreman, director of IT at Comanche Electric Cooperative. “On top of this, sending out technicians to collect and analyze data from more than 17,000 meters with such diverse terrain can be challenging.” After more than a decade pioneering the use of a power line

阅读详情

NV Energy Delivers Reliable Power Distribution with Sensus

The lights along the Las Vegas strip are so bright they […]

阅读详情

Utah Water Conservancy District Reduces Outdoor Water Use with Sensus Solution

The Weber Basin Water Conservancy District, located jus […]

阅读详情

Georgia Utility Addresses Non-Revenue Water with Sensus iPERL Meters

Just 30 miles northwest of Atlanta, the City of Dallas, […]

阅读详情

Benton PUD Builds a Foundation for the Future with Sensus

Located in the heart of Washington State’s Tri-Ci […]

阅读详情

Loudoun Water Partners with Sensus to Sustainably Manage Water Resources

Loudoun County is one of the fastest growing counties i […]

阅读详情

City of Fairmont Improves Performance and Service with the Sensus AMI Solution

Nestled in the rolling hills of northern West Virginia, […]

阅读详情

Cobb EMC Installs Smart Street Lighting Solution

Out with the old and in with the new. The move to chang […]

阅读详情
loading animation Older Entries

Please select your preferred language:

English Deutsch Français 日本語 Español 简体中文